Measure It Once.
Sell It the Same Day.
Get roof measurements, storm history and aerial imagery for any address before you leave the driveway—then turn the inspection into a signed contract without a second trip.
Stop Losing Days to Measure, Wait, Follow Up.
The old way is three trips: climb it, wait on a measurement report, come back with a proposal. By then the homeowner has two other bids. Drodat puts the measurements, the storm history and the contract in the same place, so you can price it and close it on the first visit.
One Subscription
Stop paying for a dozen different tools. One platform, one bill. It's that simple.
Unmatched Efficiency
No more app-switching or duplicate data entry. Your entire workflow, from first call to final payment, is connected.
Unified Team
Everyone on your crew works from a single source of truth, so nothing gets lost between the field and the office.
Roof Measurements Without the Ladder
Pull squares, pitch, ridge and valley lengths for any address from aerial data. Price the job accurately before you climb, and skip the per-report fees from a third-party measurement service.
Total Area
2,847 sq ft
Pitch
6/12
Ridge Length
42.5 ft
Storm Explorer
See which neighborhoods took hail or damaging wind, then work the streets that were actually hit instead of knocking blind.
Storm Explorer
Storm Days 120
Thu, Jan 30, 2025
19 cells · 140 homes
3.94" Baseball
Mar 13
Quarter · 13 homes
1.12"
Mar 10
Quarter · 40 homes
1.1"
Feb 14
Quarter
1.02"
Jan 30
Baseball · 140 homes
3.94"
NOAA MRMS ≥ 1" hail · Tap to inspect
Weather Verification Reports
Pinpoint hail size, wind speed and date of loss for any address—the evidence that turns a denied roof into an approved one.
Historical Weather
Daily Weather Updates
Enable to keep weather data up-to-date
Aerial Imagery
Pull historical flyover and satellite captures to show a carrier exactly what the roof looked like before the storm.

Imagery ©2026 Google, Vexcel Imaging US, Inc.
AI-Powered Inspections
Talk through the roof as you walk it. Drodat files every photo by slope and turns your narration into a formal inspection write-up.




Water intrusion documented at the front pillars adjoining the chimney chase, staining the full height of the exposed beam on both elevations. Moisture readings of 32% at the pillar base confirm ongoing saturation, with early-stage microbial growth at the living room entry. Pattern is consistent with failed chimney flashing rather than a plumbing source. Recommend containment per IICRC S520 and removal 24" beyond the last point of elevated moisture.
Photo Documentation
Shoot lifted shingles, creased tabs and flashing failures straight from the app—filed to the job and synced before you are off the ladder.

Intake Fills the Contract for You
Every answer your client gives during intake carries straight into the agreement. Pick the intake, pick the template, send for signature—no retyping, no transcription errors.
Water Damage — 09/03/2026
Intake · Step 11 of 11 · Complete
Adjuster Notes
New Contract
Step 1 of 3 · Choose documents
Template
Intake Form
Auto-filled (0/8)
Every Roof on One Board
Track every inspection, approval and install on a visual pipeline. See what is waiting on the carrier, what is scheduled, and what is ready to invoice.
Test Name - Claim #862 - Insuran...
Olivia M. Price
Project - 785 Willowbrook Ln, Wo...
Angela R. Morrison
Project - Oak Ridge Ln, Ashland, ...
Daniel R. Hayes
Project - 830 Covelo Ln, Myrtle B...
Jack Hanks
Project - 210 Geoffroy Dr, Santa C...
Dennis Ray
test centalization project
John Smith
Project - Red Maple Ln, Dix Hills, ...
Sarah K. Manning
Project - 332 Harbor Dr, Key Bisc...
Isabel M. Duarte
Project - 46 Harborview Ct NE, De...
Samantha K. Pierce
Dass - Estimate
Rockwell Holding Company
Project - 59 Seabreeze Ct, Panam...
Peter G. Holbrook
Project - N Brookfield Rd, Wichita,...
Hannah J. Peters
Scheduling
One calendar for inspections, adjuster meetings and install crews, tied to the right property and homeowner.
Sep 20 – Sep 26, 2026
TZWeekSUN
20
MON
21
TUE
22
WED
23
THU
24
FRI
25
SAT
26
Initial Inspection — 1420 Bayshore Dr
9:00 – 10:30 AM
Scope Review — Hail claim
1:00 – 1:45 PM
Team Standup
3:00 – 4:00 PM
Carrier call
3:00 – 4:00 PM
Insurance Adjuster Meeting — Field adjuster
10:00 AM – 12:00 PM
Contractor Walkthrough — Roof
2:00 – 3:00 PM
Emergency Service Call — Water loss
8:30 – 10:30 AM
Client Meeting — Settlement review
1:00 – 2:00 PM
Site Documentation — 9064 Harding
11:00 – 11:45 AM
Re-Inspection — Supplement
2:00 – 3:00 PM
Final Walkthrough — Coral Gables
9:30 – 10:15 AM
Internal Team Meeting
Cloud Management
Measurements, photos, contracts and carrier correspondence stored against the job, reachable from the roof or the office.
Cloud
From the Drodat Journal
The roofing playbook
Ready to transform your workflow?
Join thousands of property professionals who've streamlined their operations, reduced manual work, and accelerated their business with Drodat's intelligent platform.
